Residential
Harbour Central
Canary Wharf, London
Project Data
Client: Galliard Homes
Architect: Rolfe Judd
Contract Duration: 39 months
Contract Value: £17,600,000
Harbour Central is a spectacular residential development in London’s Docklands, comprising 642 luxury private apartments spread across five buildings.
The 42-storey Maine Tower, the largest of the buildings, has a total of 299 highly specified apartments ranging from studios to penthouses. Harbour Central’s leisure complex includes a residents’ club with a library, concierge, gym and spa, business suites and a cinema.
J S Wright was responsible for installing, testing and commissioning the mechanical engineering infrastructure for the development, as well as completing the fit-out of the mechanical services for the Maine Tower and the M&E services for the amenity and club areas.
Mechanical Installations – Shell and Core
-
Natural gas supply from gas meter room to basement energy centre
-
LTHW communal heating system incorporating a combined heat and power (CHP) unit and five condensing boilers
-
Roof-mounted air-cooled and basement water-cooled chilled water systems
-
Cold water storage tanks and booster sets
-
Mechanical ventilation systems for plantrooms
-
Car park and smoke ventilation services
-
Above ground drainage and rainwater harvesting systems
-
Wet and dry risers
Mechanical Installations – Apartments
- LTHW distribution to each of the apartments via heat interface units for domestic hot water services and underfloor heating
- Comfort cooling through fan coil units connected to main infrastructure chilled water main plant
- Domestic water services including boosted cold water
- Whole house ventilation systems incorporating heat recovery
- Commercial sprinklers to car park and landlord areas
- Domestic sprinklers
- Above ground drainage
- Sanitaryware and brassware installations
Mechanical and Electrical Installations – Amenities
- Heating and comfort cooling via fan coil units
- Domestic water services including sanitaryware and brassware
- Heat recovery ventilation
- Sprinklers
- Above ground drainage
- Lighting and power
- Security controls and fire alarms
- Audio visual, TV and data installations
jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48
Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000