Former Honiton Inn, Exeter

Former Honiton Inn, Exeter

Student Accommodation

Former Honiton Inn

Paris Street, Exeter

Project Data

Client: PSP Consultants
Architect: Grainge Architects
Contract Duration: 6 months
Services Value: £1,300,000

The former Honiton Inn in Exeter has been redeveloped as student accommodation. The new eight-storey building in the city centre comprises 120 flexible apartments along with communal facilities including kitchens, a laundry room, café bar, administration office, and cycle storage.

J S Wright was responsible for designing, installing, testing, and commissioning the mechanical and electrical services for all the apartments and amenities.

Mechanical Installations
  • Mains cold water installations
  • Low pressure hot water (LPHW) heating incorporating gas-firedcondensing boilers
  • Domestic hot and cold-water services, including boosted cold water, for all apartments
  • Natural gas installation

  • General supply and extract mechanical ventilation
  • Extract MVHR for the kitchens and showers within all apartments
  • Apartment residential sprinkler installations
  • Dry risers
  • Sanitaryware for all apartments
  • Above ground drainage and internal rainwater systems
  • Air conditioning split system for the comms room
  • Building management system (BMS)
Electrical Installations
  • Low-voltage (LV) switchboard with power and lighting distribution to individual apartments
  • LV distribution boards and cabling serving power and lighting to communal areas

  • External lighting to building

  • Access control and door entry system

  • CCTV to communal areas

  • TV and data systems to all apartments

  • Disabled refuge

  • Lightning protection

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Premier Inn Greenwich

Premier Inn Greenwich

Hotel

Premier Inn
Greenwich

London

Project Data

Contract Duration: 10 Months
Services Value: 1 Million

J S Wright’s Hotel Division were responsible for the supply and installation of air conditioning (VRF) to serve 150 bedrooms along with restaurant, reception and offices within the complex, this also included hot and cold water services, mechanical ventilation and waste systems.

J S Wright’s scope of work included:
  • Air Conditioning system to serve 150 bedrooms along with reception and management offices
  • Ventilation systems to bedrooms, reception, public toilets and kitchen area
  • Hot and Cold Water Systems to all bedrooms and public areas
  • BMS trend control for hot water services along with air conditioning system within management office

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Etap Hotel, Leeds

Etap Hotel, Leeds

Hotel

Etap
Hotel

Leeds

Project Data

Contract Duration: 9 Months
Services Value: £630,000

J S Wright’s Hotel Division have completed the installation of the Mechanical and Plumbing Services to the new 218 Bedroom 2/3 Star Etap Hotels at Leeds.

J S Wright’s scope of work included:
  • The complete installation on this project was carried out utilising Crimped Tube and Fittings.
  • Bedroom Comfort Cooling System via External Heat
  • Pump and Fan Coil Units
  • Ventilation
  • Hot and Cold Water Systems
  • Foul and Rainwater Disposal
  • Gas Installation
  • Sanitary Ware Installation
  • Automatic Control
  • Dry Riser

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Goscote & Brownhills, Walsall

Goscote & Brownhills, Walsall

Care Homes

Goscote & Brownhills

Walsall

Project Data

Client: Housing 21
Architect: Calfordseadon
Contract Duration: 8 months
Services Value: Goscote £400,000
Services Value: Brownhills £480,000

J S Wright’s Commercial Division were involved in the installation of the mechanical and public health services to two Walsall care homes; Goscote, a 40 bedroomed dementia care home facility and Brownhills a care home with 60 bedrooms.

J S Wright’s scope of work included:
  • Mechanical ventilation to all bedrooms and to central staff areas

  • Gas installation

  • Domestic hot & cold-water systems

  • Heating distribution to underfloor heating system

  • Foul, drainage and rainwater

  • Automatic controls

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Drovers House – Rugby

Drovers House – Rugby

Contract Duration: 8 Months

Services Value: £850,000

Drovers House
Rugby Warwickshire

J S Wright’s Care Homes Division were responsible for the design, installation and commissioning of Drovers House, a 75 bed care home in Rugby, Warwickshire for WCS care group.

J S Wright’s scope of work included:

  • VRF Heating & Cooling Installations
  • Heating Installation from Central Boiler Plant
  • Domestic Hot & Cold Water Distribution
  • Gas Installation to Boiler House & Kitchen Areas
  • Mechanical Ventilation to all areas, Including Apartments & Communal Areas
  • Above Ground Drainage
  • Sanitaryware to all Apartments & Communal Areas
  • Full Building Services Electronic Control System

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Dial Lane, West Bromwich

Dial Lane, West Bromwich

Care Homes

Dial Lane
West Bromwich

Birmingham

Project Data

Client: Housing 21
Contract Duration: 12 months
Services Value: £800,000

J S Wright’s Care Homes Division were responsible for the design, installation and commissioning of the mechanical and public health services including the building services control package for this prestigious residential care home in West Bromwich.

The facility includes 81 bedrooms and in addition, communal areas complete with restaurant dining area, hairdressing salon and laundry.

J S Wright’s scope of work included:
  • Mechanical ventilation to all dwellings, staff & refuse areas
  • Domestic H&C services in sanitaryware
  • Underfloor heating system and mains distribution
  • Central plantroom including CHP
  • Foul, drainage collection
  • Automatic controls

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Bloc Hotel, Jewellery Quarter, Birmingham

Bloc Hotel, Jewellery Quarter, Birmingham

Hotel

Bloc Hotel
Jewellery Quarter

Birmingham

Project Data

Client: Boxbuil
Architect: J. Ross
Contract Duration: 6 months
Services Value: £330,000

J S Wright’s Hotel Division have completed the installation of the mechanical and plumbing services to this new 67-bedroom hotel located in the Jewellery Quarter, Birmingham’s vibrant cultural heart. Offering ultra-modern decor, the Bloc hotel’s rooms are inspired by Japanese space-saving interior design.

The rooms are air-conditioned and feature Italian-tiled shower rooms with a luxury drench shower.

Heating and cooling to the bedrooms is provided by ducted type VRF indoor units mounted directly above the door of the room. Each unit is supplied complete with simplified wall mounted room controller.

The installation is a two-pipe system allowing all rooms units to provide heating or cooling at any one time. External condensers are mounted on the flat roof.

J S Wright’s scope of work included:
  • air conditioning and heating

  • ventilation

  • hot and cold-water systems

  • foul and waste system

  • automatic controls

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000