Keybridge, Vauxhall

Keybridge, Vauxhall

Residential

Keybridge

Vauxhall

Project Data

Client: Mount Anvil and FABRICA by A2 Dominion

Architect: Allies and Morrison

Contract Duration: 48 months

Contract Value: £27 million

Keybridge is a landmark mixed-use development in London, comprising Keybridge House, Keybridge Point, and Keybridge Lofts which, at 37 storeys is the UK’s tallest brick residential tower.

J S Wright was responsible for designing and building the M&E services for the 473 apartments and penthouses, along with the concierge, gym, commercial primary supplies, plant rooms and basement car park.

Mechanical Installations:
  • Mains cold water supply from site boundary to wet riser tank, cold water tank and booster set in basement plant room, with distribution pipework to apartments and basement CAT5 wash-down booster set
  • Boosted cold-water systems, including pipework and boosted cold water feed to apartment HIUs to serve domestic appliances
  • Gas-fired boilers and CHP unit in energy centre, including LTHW heating system pumps and pipework to apartment HIUs, underfloor heating and radiators
  • Chilled water plant within basement plant room with distribution to selected apartments
  • MVHR systems to serve apartments, concierge, gym and pool, and supply & extract ventilation serving bin stores, energy centre, pool plant room and concierge toilet areas
  • Above ground drainage soil vent pipework from apartments, siphonic drainage from roofs, and rainwater drainage within car park to serve podium area
  • VRF heating and comfort cooling for concierge, gym and pool areas, and split system AC for cold store
  • Sprinkler system fed by boosted cold water serving all apartments, with concierge monitoring
  • Firefighting wet riser feed from basement plant room, with dedicated tank and pump system, serving outlets on all floors of Keybridge House and Keybridge Lofts, and AOV system throughout all blocks

 

Electrical Installations:
  • Lighting and power installations to all apartments and communal, concierge, gym, pool and basement car park areas, as well as to switch rooms, basement plant rooms and disabled refuge stores
  • External lighting to podium area and building façade
  • CCTV to communal, car park and external podium areas
  • Access control and door entry system to all buildings
  • Fire alarms to all blocks, plant rooms, concierge, gym, pool and car park areas
  • TV, data and fibre installation to all apartments, concierge and commercial areas

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Nine Elms Point, Vauxhall, London

Nine Elms Point, Vauxhall, London

Residential

Nine Elms Point

Vauxhall, London

Project Data

Client:Barratt London and Sainsbury’s

Architect: Rolfe Judd

Contract Duration: 50 months

Contract Value: £22 million

Nine Elms Point is a major new residential and retail development at Vauxhall in central London. The
development on the south bank of the River Thames comprises seven residential buildings – the tallest of
which is 37 storeys – and a new flagship Sainsbury’s superstore.

Linked by open green space and landscaped raised gardens, Nine Elms Point forms a key part of the ongoing Nine Elms redevelopment, London’s largest transformation project.

J S Wright was responsible for the installation, testing and commissioning of pre-designed mechanical services for the 645 private and shared ownership apartments and penthouses, along with the concierge, gym, lounge and dining rooms, business suite, cinema room and basement car park.

Mechanical Installations:
  • Boosted cold-water distribution systems

  • Wet riser installations

  • Commercial sprinkler system for Sainsbury’s service yard and car park, as well as sprinklers for residential car park

  • Residential sprinkler system, connected to the boosted cold-water distribution system

  • Underfloor heating for all private and shared ownership apartments

  • Comfort cooling by fan coil units for selected apartments

  • Mechanical ventilation heat recovery systems serving all apartments

  • Sanitaryware for all apartments

  • Refuse chutes within each building

  • Fit out of commercial and gym areas with all mechanical services including heating, air conditioning and ventilation systems

  • Below ground drainage system installation across Sainsbury’s podium level

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Indescon, Isle of Dogs

Indescon, Isle of Dogs

Residential

Indescon 
Isle of Dogs

London

Project Data

Client: Galliard Homes
Architect: BUJ Architects
Contract Duration: 24 months
Services Value: £19,000,000

J S Wright’s Residential Division were responsible for the lndescon Court Phase 2 project, located in the Isle of Dog s near to London’s Canary Wharf.

It consists of 546 residential units spread over a six-block development along with a 129 room Hotel with leisure facilities, four retail units and communal spaces all built around communal gardens and above basement car park.

J S Wright’s scope of work included:
  • above ground foul drainage & rainwater throughout
  • cold water storage tanks & booster sets
  • boosted cold water
  • energy centre installation s including heating & chilled water pump sets & plate heat exchangers for each block
  • gas fired boilers & CHP installation
  • roof mounted air-cooled chillers & associated services
  • trend building management system & automatic controls
  • MBUS cold water & heat metering data collection system
  • heat interface unit installations within each of the 546 domestic dwellings
  • heating & comfort cooling fan coil unit installations in all private dwellings
  • mechanical & public health fit-out of all apartments including radiators & sanitaryware installations

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Harbour Central, Canary Wharf, London

Harbour Central, Canary Wharf, London

Residential

Harbour Central

Canary Wharf, London

Project Data

Client: Galliard Homes

Architect: Rolfe Judd

Contract Duration: 39 months

Contract Value: £17,600,000

JS-WRIGHT-Harbour-Central-1

Harbour Central is a spectacular residential development in London’s Docklands, comprising 642 luxury private apartments spread across five buildings.

The 42-storey Maine Tower, the largest of the buildings, has a total of 299 highly specified apartments ranging from studios to penthouses. Harbour Central’s leisure complex includes a residents’ club with a library, concierge, gym and spa, business suites and a cinema.

J S Wright was responsible for installing, testing and commissioning the mechanical engineering infrastructure for the development, as well as completing the fit-out of the mechanical services for the Maine Tower and the M&E services for the amenity and club areas.

Mechanical Installations – Shell and Core

  • Natural gas supply from gas meter room to basement energy centre

  • LTHW communal heating system incorporating a combined heat and power (CHP) unit and five condensing boilers

  • Roof-mounted air-cooled and basement water-cooled chilled water systems

  • Cold water storage tanks and booster sets

  •  Mechanical ventilation systems for plantrooms

  • Car park and smoke ventilation services

  • Above ground drainage and rainwater harvesting systems

  • Wet and dry risers

Mechanical Installations – Apartments

  • LTHW distribution to each of the apartments via heat interface units for domestic hot water services and underfloor heating
  • Comfort cooling through fan coil units connected to main infrastructure chilled water main plant
  • Domestic water services including boosted cold water
  • Whole house ventilation systems incorporating heat recovery
  • Commercial sprinklers to car park and landlord areas
  • Domestic sprinklers
  • Above ground drainage
  • Sanitaryware and brassware installations

Mechanical and Electrical Installations – Amenities

  • Heating and comfort cooling via fan coil units
  • Domestic water services including sanitaryware and brassware
  • Heat recovery ventilation
  • Sprinklers
  • Above ground drainage
  • Lighting and power
  • Security controls and fire alarms
  • Audio visual, TV and data installations

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

The Silk District, London

The Silk District, London

Residential

The Silk District

Whitechapel, London

Project Data

Client: Mount Anvil and L&Q

Architect: Stockwool

Contract Duration: 24 months

Contract Value: £17,500,000

Silk District London
The Silk District is an ongoing residential development in Whitechapel named after the domestic weaving industry that was on the site from the 17th century.

J S Wright was responsible for designing and fitting out the M&E services for the first phase of the development, comprising a total of 412 homes and communal space in two buildings of 20 floors and seven floors respectively. The amenities it also serviced included a workspace, cinema room, gym and 24-hour concierge.

Mechanical Installations:
  • Mains cold water supply to central basement plantroom with distribution pipework to apartments
  • Boosted cold water-water systems including pipework and boosted cold water feed to apartment HIUs to serve domestic appliances
  • Gas-fired boilers and CHP unit in energy centre including LTHW heating system pumps and pipework to apartment HIUs for domestic hot water service and underfloor heating or radiators
  • Mechanical ventilation heat recovery systems serving apartments and resident amenities
  • Smoke and environmental ventilation services
  • Underground car park ventilation
  • Above ground drainage
  • Internal rainwater system
  • Domestic sprinklers fed by boosted cold water systems
  • Wet and dry risers in all areas
  • Sanitaryware and brassware installations
  • Building Management System controls

 

Electrical Installations:
  • Lighting, power and fire alarm installations to all areas
  • Access control and door entry systems to all areas
  • Rooftop solar photovoltaic panels
  • TV infrastructure to all apartments and concierge
  • M-Bus credit energy metering system

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Castle Park View, Broad Weir, Bristol

Castle Park View, Broad Weir, Bristol

Residential

Castle Park View

Broad Weir, Bristol

Project Data

Client: Bouygues UK

Architect: Chapman Taylor

Contract Duration: 24 months

Contract Value: £12,400,000

JS-Wright-Castle-Park-View-3
Castle Park View is the first private housing development to be connected to Bristol City Council’s heat network and includes Bristol’s tallest residential tower.

The 300 private rented apartments and 75 affordable apartments are bookended within buildings of 26 storeys and ten storeys.

J S Wright was responsible for the installation, testing and commissioning of the mechanical and electrical services for all 375 apartments and communal areas across the 180,000 sq ft development.

Mechanical Installations:
  • Low pressure hot water (LPHW) heating system connected to Bristol heat network in heating plant room
  • Distribution pipework to feed LPHW to apartment heat interface units (HIUs) for domestic service and underfloor heating
  • Boosted cold water system including pipework from cold-water plant room to serve all apartments
  • Heat interface units supplied on utility boards from in-house prefabrication department
  • Mechanical ventilation heat recovery (MVHR) and mechanical extract ventilation (MEV) systems
  • Sanitaryware and brassware installations
  • Internal rainwater harvesting system
  • Above ground drainage system
  • Sprinkler system fed by boosted cold water to serve all apartments
  • Smoke and environmental ventilation
  • Wet and dry risers in communal areas including underground parking

 

Electrical Installations:
  • Lighting, power, fire alarm and TV infrastructure installations in all apartments

  • Photovoltaic roof-mounted solar panels

  • Access control and door entry systems

  • M-Bus credit metering to record individual apartment energy use

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Fish Island Village – Hackney Wick, London

Fish Island Village – Hackney Wick, London

Residential

Fish Island Village
Phases 1 and 2

Hackney Wick – London 

Project Data

Client: Hill and Peabody Trust
Architect: Haworth Tompkins, Pitman Tozer and London Goode
Contract Duration: 26 Months
Contract Value: £11,500,000

Fish Island Village 1 & 2 is a vast award-winning mixed-use development at Hackney Wick in London. Designed and built by housebuilder Hill and housing association Peabody with the area’s industrial heritage in mind, the scheme aims to create a lively and vibrant canalside community.

J S Wright was responsible for installing, testing and commissioning the mechanical services for all 423 one, two and three-bedroom private and affordable apartments, along with a concierge, gym and underground parking, in the first two phases of the development comprising 16 blocks.

J S Wright also provided the services for The Trampery, a ground floor level network of workspaces on the development, managed by the social enterprise of the same name.

Mechanical Installations – Apartments
  • Mains cold water supply from site boundary to storage tank and booster set in basement energy centre, with distribution pipework to all flats
  • Natural gas supply from bulk gas meter to communal boilers in energy centre
  • LTHW heating from community gas boilers in energy centre to apartment HIU boilers for domestic hot water service and underfloor heating
  • Hot and cold-water systems, including pipework and boosted cold-water feed from energy centre to apartment HIUs to serve all domestic appliances
  • Mechanical ventilation heat recovery systems serving apartment blocks and concierge
  • Local supply and extract systems to energy centre, cleaners’ cupboards and bin stores
  • Rainwater drainage pipes for balconies
  • Above ground drainage to remove soil, waste and overflows from all flats and energy centre to underground drainage system
  • Sanitaryware to all apartment blocks and cleaners’ cupboards, including internal rainwater installation
  • Building Management System (BMS) for controlling and monitoring main plant, including metering for individual apartment energy consumption complete with a prepayment system
Mechanical Installations – The Trampery
  • Boosted cold water supply from existing cold-water connection
  • LTHW heating via indirect HIUs for delivering instantaneous hot water to radiators, including hot and cold-water pipework
  • Passive and extract ventilation systems and above ground drainage

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Mint Hotel, London

Mint Hotel, London

Hotel

Mint Hotel

London

Project Data

Contract Duration: 15 Months
Services Value: £10 Million 

J S Wright’s Hotel Division have completed the latest addition to the Mint Hotel Group, (formerly City Inns), at Tower Hill, Pepys Street, London.

The Hotel consists of 574 rooms spread over 9 floors. In addition to this, there are 5 meeting rooms, 3 conference rooms all with their own dining facilities, a main restaurant and bar-restaurant. An impressive sky lounge with its own meeting rooms, bar and dining facility and the dedicated kitchen is situated at roof level.

J S Wright’s scope of work included:
  • Chilled water and heating installation including off site boiler fabrication
  • Mechanical ventilation to all areas including bedroom, reception and back of house areas
  • Extra Low Temperature to fan coil units in bedrooms
  • Domestic hot and cold water distribution to all areas
  • Gas installations to main plant, CHP and kitchen areas
  • Kitchen services installations
  • A fully addressable Building Management System
  • Foul Drainage Systems
  • Sanitary ware to non residential areas
  • Life safety systems including smoke ventilation, associated fire rated duct work installations, smoke clearance and AOV installations.

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Stadia Three, Plough Lane, London

Stadia Three, Plough Lane, London

Residential

Stadia Three

Plough Lane, London

Project Data

Client: Galliard Homes

Architect: Sheppard Robson

Contract Duration: 27 months

Contract Value: £9,000,000

JS-WRIGHT-Harbour-Central-1

Stadia Three is the first residential element of Wimbledon Grounds, a new multi-million-pound development of 632 homes, anchored by a state-of-the-art football stadium for AFC Wimbledon, on Plough Lane in Wimbledon.

J S Wright was responsible for installing, testing and commissioning the mechanical engineering infrastructure systems for the seven-storey brick building and fitting out the mechanical services for 413 apartments.

Mechanical Installations – Shell and Core

  • Natural gas supply to basement energy centre
  • LPHW communal heating system incorporating combined heat and power (CHP), four condensing boilers and distribution pipework
  • Cold water plantrooms incorporating storage tanks and booster sets
  • Mechanical ventilation systems for all plantrooms
  • Above ground drainage and rainwater harvesting systems
  • Wet and dry risers
  • Building management system

Mechanical Installations – Apartments

  • LPHW distribution to each of the apartments via heat interface units for domestic hot water and radiator heating

  • Mechanical ventilation incorporating extract (MEV) and heat recovery (MVHR) systems

  • Sanitaryware installation

  • Residential sprinkler systems

  • HDPE above ground drainage installation

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Lock No 19, Bream Street, London

Lock No 19, Bream Street, London

Residential

Lock No 19

Bream Street, London

Project Data

Client: London & Quadrant Group

Architect: AHMM

Contract Duration: 17 months

Contract Value: £6,000,000

JS-WRIGHT-Harbour-Central-1

Lock No 19 is a high-quality residential-led development on the banks of the River Lee Navigation at Bream Street on Fish Island in Hackney Wick, London.

J S Wright was responsible for installing, testing and commissioning the mechanical services for all 202 apartments (30% of which are affordable) within its seven two to six-storey buildings.

The commission also included 12 months of service maintenance.

Mechanical Installations

  • Communal heating energy centre incorporating combined heat and power (CHP) and gas-fired condensing boiler units
  • LPHW distribution to each of the apartments via heat interface units for domestic hot water services and either underfloor heating or radiators depending on apartment tenure
  • Boosted cold-water distribution from a cold-water plantroom to all apartments
  • Mechanical ventilation heat recovery (MVHR) systems serving all apartmentss
  • Sanitaryware including internal rainwater installation
  • Domestic sprinkler system and dry risers for fire fighting
  • Carpark and smoke ventilation services
  • Above ground drainage system installation
  • Building management system (BMS)

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Central Square – EC1, London

Central Square – EC1, London

Contract Duration: 20 Months

Services Value: £5.9 Million

Central Square
EC1, London

J S Wright’s Residential Division were responsible for The Central Square Project, located between Angel, Old Street & Barbican near to London’s East End. It consists of 274 residential and 17 commercial units spread over a 16 block development all built around communal gardens and above a communal basement carpark.

J S Wright’s scope of work included:

  • Above Ground Foul Drainage and Rainwater
  • Basement Sump Pumping Stations
  • 32000 Litre Cold Water Storage Tank & Booster Set
  • All Boosted Cold Water Copper Pipework Distribution
  • Four 655Kw Hoval Gas Fired Boilers & Associated Chimney Flues
  • 130Kw Bio Fuel Fired Combined Heat & Power Unit & Associated Chimney Flue
  • Carbon Steel & Heavy Grade Pre-fabricated Chilled Water Pipework Distribution

  • Two 720Kw CIAT Water Cooled Chillers & Interconnecting Roof Top Air Cooled Condensers
  • Trend Building Management System & All Automatic Controls
  • MBUS Heat Metering, Data Collection & Remote Billing System
  • Heat Interface Unit Installations within each of the 274 Domestic Dwellings
  • Supply & Installation of all Domestic Sanitaryware
  • Underfloor Heating Installation throughout each of the 170 Private Ownership Plots

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Queensland Road

Queensland Road

Residential

Queensland Road
Highbury

London

Project Data

Contract Duration: 24 Months
Services Value: £5.5 Million
Architect: CZWG
Mechanical Contractor: Whitecode

The JSW London team have carried out the following works in partnership with Barratt London JV. Queensland Road is a residential project, adjacent to the Emirates stadium, consisting of 375 luxury apartments in 3 tower blocks, a combination of Barratt’s working alongside Arsenal FC.

Heating to these apartments is via a main energy centre from which JSW have run new mains LTHW across the car park to 3 satellite plantroom plate heat exchangers. Each tower block then distributes mains LTHW pipework via risers and corridors into each apartment to a new HIU. These HIU’s in turn are the heat source for the UFH and hot water cylinder.

Every apartment has under floor heating throughout and all hot water to kitchens and bathrooms is supplied by the new cylinders. All apartments also have an MVR ventilation system controlled via room stats and programmers. There is also an energy meter in each HIU for remote reading by the energy provider.

The penthouses apartments, customer care and gymnasiums in each block also have additional comfort cooling.

J S Wright’s scope of work included:
  • Controls
  • Comfort cooling
  • Auto controls
  • Drainage
  • Heating
  • Hot water
  • Ventilation

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

New Union Wharf, London

New Union Wharf, London

Residential

New Union Wharf

Phase 4

Isle of Dogs, London

Project Data

Client: The Hill Group and L&Q

Architect: Jestico + Whiles and PRP Architects

Contract Duration: 16 months

Contract Value: £5,000,000

JS-Wright
New Union Wharf is a multi-phase estate regeneration on the banks of the River Thames in which a 1970s estate has been replaced by 399 modern, energy efficient homes.

J S Wright was responsible for designing and building the mechanical services for all 201 apartments and communal spaces within the fourth phase of the development. The contract followed the company’s completion of the 114-home second and third phases.

Mechanical Installations:
  • Boosted cold water (BCW) plantroom with distribution network to deliver boosted cold water to apartments for domestic hot and cold-water services
  • Low temperature hot water (LTHW) heating network from combined heat and power (CHP) gas boilers to feed apartments via heat interface units (HIUs) for domestic hot water services and underfloor heating
  • Mechanical ventilation heat recovery (MVHR) systems
  • Car park ventilation
  • Residential sprinkler system fed by boosted cold water
  • Above ground drainage
  • Internal rainwater system
  • Supply and installation of all sanitary ware
  • Individual apartment energy monitoring and prepayment billing systems
  • Dry risers
  • Building management controls

 

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Greenwich Reach, London

Greenwich Reach, London

Residential

Greenwich Reach

London

Project Data

Client: Galliard Homes

Architect: BUJ Architects

Contract Duration: 12 months

Contract Value: £4.7 million

JS Wright Greenwich Reach
JS Wright Greenwich Reach
JS Wright Greenwich Reach

J S Wright’s Residential Division were responsible for developing the infrastructure of Greenwich Reach, Greenwich, London.

This development contains12 residential blocks with 980 self contained apartments, 14 commercial units and a Waitrose supermarket.

J S Wright’s scope of work included:
  • Main Energy Centre
  • Natural Gas CHP Unit
  • Bio Fuel LTHW Boiler
  • Natural Gas Fired Boilers
  • LTHW zonal primary heating distribution systems, serving 6 satellite plantrooms
  • LTHW zonal secondary heating distribution systems, serving each residential block
  • Boosted Cold Water systems in each of the satellite plantrooms
  • Supply air system to the Energy Centre boilers
  • Automatic BMS controls
  • Natural Gas installation
  • Supply and extract air systems, serving the stand-by Diesel Generator
  • Bio-Fuel pumped delivery system

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Wixams Retirement Village, Bedfordshire

Wixams Retirement Village, Bedfordshire

Care Homes

Wixams
Retirement Village 

Bedfordshire

Project Data

Client: Extra Care Charity Trust
Architect: Nicol Thomas M & E Consultants: Dominic Frampton
Contract Duration: 24 months
Contract Value: £4.6 million

Wixams Retirement Village provides independent community living for over 55s in a six-acre greenfield setting near Bedford. The development is the result of a partnership between Bedford Borough Council, The Harper Trust, Homes England and The ExtraCare Trust.

J S Wright were responsible for Design, (based on a performance specification) installing, testing and commissioning the mechanical services for Wixams’ RV 230 one- and two-bedroom apartments, communal areas and facilities.

J S Wright’s Mechanical Services scope of work include:
  • Mains water supply

  • Natural gas supply to ground floor plantroom and central kitchen

  • LPHW heating incorporating gas-fired condensing modular boilers

  • Chilled water distribution pipework

  • Above ground drainage & internal rainwater

  • Domestic hot & cold-water services for apartments

  • MVHR to all apartments

  • Supply & extract ventilation systems to village centre

  • Natural ventilation of the upper atrium space

  • Smoke ventilation

  • Domestic sprinklers system to apartments. Mist suppression system for village centre ground floor

  • Fire-fighting dry risers

  • VRF heating and comfort cooling for communal areas within village centre and residential corridors

  • Building Management System

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Blackwall Reach, Phase 1B, Poplar, London

Blackwall Reach, Phase 1B, Poplar, London

Residential

Blackwall Reach

Phase 1B, Poplar, London

Project Data

Client: Hill and NU living

Architect: BPTW

Contract Duration: 27 months

Contract Value: £4,500,000 

JS-WRIGHT-Blackwall Reach Phase 1B, Poplar, London

Blackwall Reach is one of the UK’s largest residential mixed-use urban regeneration projects.

The £300million development in the Poplar district of east London will create more than 1,500 new homes in a brand-new neighbourhood occupying over 20 acres.

J S Wright was responsible for the design, installation, testing and commissioning of the mechanical services for Phase 1B, now known as Station Square, comprising 242 homes and commercial areas within two nine-storey buildings and a 23-storey tower.

Mechanical Installations:
  • Three plate heat exchangers within a central energy centre to deliver LTHW heating to all three buildings

  • Associated twin pump sets, pressurisation units, degassers, and side stream filters

  • LTHW distribution to each of the apartments via heat interface units for domestic hot water services and underfloor heating

  • Cold water storage tanks within two tank rooms

  • Associated cold water booster sets, water conditioners and BMS alarm panels, including below ground pipework to the 23-storey building

  • Mechanical ventilation heat recovery systems with supply and extract grilles for all apartments

  • Comfort cooling for all eight penthouses

  • Above ground drainage and rainwater harvesting systems

  • CAT 5 washdown system

  • Sanitaryware and brassware

  • Mains cold water feed into retail units

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Paradise Birmingham, Chamberlain Square

Paradise Birmingham, Chamberlain Square

Commercial

Paradise Birmingham

Chamberlain Square

Project Data

Client: Paradise Circus Limited Partnership
Architects: Glenn Howells and Eric Parry
Contract Duration: 12 Months
Services Value: £1.4 million

Paradise Birmingham is one of the largest office-led regeneration projects outside London. The £700million development in Birmingham city centre will comprise up to ten new buildings containing office, residential, shops, bars, cafés, and restaurants across 17 acres.

J S Wright was responsible for installing, testing, and commissioning the mechanical and electrical services for the Phase One infrastructure works.

The company previously carried out enabling works for the demolition of the city’s old Central Library to make way for a two-storey car park within the development.

Mechanical Installations
  • Chilled water plant with distribution serving neighbouring Town Hall Birmingham
  • Boosted cold water plant for distribution including landscape irrigation
  • Hot and cold water services for management suite
  • General ventilation for management suite, plant room and communal areas
  • Direct Expansion (DX) cooling
  • Car park ventilation and CAT5 systems
  • Above ground drainage and rainwater harvesting systems
  • Fire control sprinklers
  • Electric panel heaters
  • Gas ducting and trace heating
  • Sanitaryware installation
  • Building Management System
Electrical Installations
  • High voltage (HV) mains distribution to landlord areas via HV switch room
  • Low voltage (LV) supply for tenants via district network operator (DNO) substation
  • Uninterruptible power system incorporating diesel generator
  • Landlord switchboards
  • Submain distribution cabling
  • Small power distribution
  • External lighting and emergency lighting
  • Access control and door entry systems
  • CCTV equipment
  • Automatic fire detection and alarm systems
  • Car park lighting

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Dandara Arena Central, Birmingham

Dandara Arena Central, Birmingham

Residential

Dandara Arena Central

Birmingham

Project Data

Client: Dandara

Architect: Corstorphine + Wright

Contract Duration: 24 months

Contract Value: £4,000,000

Dandara Arena Central is a major two-block private residential development near Paradise Circus in Birmingham city centre

J S Wright was responsible for the design, installation, testing and commissioning of the mechanical and electrical services for the 324 one and two-bedroom apartments along with the concierge, gym, lettings area and basement car park.

Mechanical Installations:
  • Mains cold water supply from site boundary to concierge, lettings, wet riser tank, cold water tank and booster set in basement plant room with distribution pipework to apartments, and basement CAT5 wash-down booster set
  • Hot and cold-water systems, including pipework and boosted cold water feed from plant room to apartment electric water cylinders to serve all domestic appliances
  • Mechanical ventilation heat recovery systems serving apartment block mezzanine levels, concierge, gym and lettings areas
  • Mechanical extract ventilation systems serving apartment block levels one to 22, basement substation, lettings kitchen and toilet areas, and concierge toilet areas
  • Above ground drainage soil vent pipework from all apartments and concierge and lettings areas
  • Siphonic rainwater drainage from roof areas
  • Rainwater drainage within basement car park serving podium area
  • VRF heating and comfort cooling for concierge, gym and lettings areas, and split system AC cooling for cold store
  • Sprinkler system fed by boosted cold water serving all apartments, with monitoring from concierge
  • Firefighting wet riser fed from basement plant room, with dedicated tank and pump system, serving outlets on all floors
  • Firefighting wet riser fed from basement plant room, with dedicated tank and pump system, serving outlets on all floors
  • Gas fire suppression system serving basement substation

 

Electrical Installations:
  • Lighting and power installation to all apartments, and communal,concierge, gym, lettings and basement car park areas

  • Electric heating to all apartments

  • External lighting to podium area and building façade

  • CCTV to communal, car park and external podium areas

  • Access control and door entry system

  • Fire alarm installation to ground floor, concierge, lettings andbasement car park areas

  • TV, data and fibre installation to all apartments, concierge and lettingsareas

  • Disabled refuge

  • Lightning protection

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Timber Yard, Birmingham

Timber Yard, Birmingham

Residential

Timber Yard

Southside, Birmingham 

Project Data

Client: Galliard Homes

Architect: Claridge Architects

Contract Duration: 24 months

Contract Value: £4,100,000

Timber Yard Southside, Birmingham
Timber Yard Southside, Birmingham
Timber Yard Southside, Birmingham

Timber Yard is a mixed-use development in Birmingham’s Southside Chinese Quarter consisting of two residential buildings of up to 14 storeys, along with 10,000 sq ft of ground-floor commercial space, aimed at young professionals.

J S Wright was responsible for fitting out the mechanical services for all 379 one-, two- and three-bedroom apartments across both buildings, along with the concierge, gym, club lounge, screening lounge and basement car park.

Mechanical Installations:
  • Direct electric hot water cylinders to provide all apartments with thermostatically controlled and pressurised hot and cold water
  • Sanitaryware and brassware installations
  • Internal rainwater harvesting system
  • Above ground drainage system
  • Whole house ventilation systems incorporating heat recovery
  • Sprinkler system fed by boosted cold water serving all apartments
  • Dry risers in communal areas for fire protection
  • Building management system for landlord control and monitoring of all building services

 

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Left Bank, Broad Street – Birmingham

Left Bank, Broad Street – Birmingham

Residential

Left Bank
Broad Street

Birmingham

Project Data

Client: Regal
Architect: Glancy Nicholls Architects
Contract Duration: 18 months each phase
Services Value: Phase 1 £1.7 Million. Phase 2 £2.2 Million

J S Wright’s Residential Division were responsible for The Left Bank development located on Broad Street in central Birmingham.

The first phase consists of 189 apartments, with phase 2 consisting of 217 skyscraper apartments with spectacular views over Birmingham, as well as amenity spaces. There is also a retail unit within each phase.

J S Wright’s scope of work include:

Mains water supply

Domestic storage water heaters

Above ground foul and rainwater drainage

Cold water storage tanks, booster sets and distribution

Domestic MVHR & purge ventilation

Communal ventilation

Residential sprinkler installation

Building management system

Wet riser installation

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Canada Water, Rotherhithe

Canada Water, Rotherhithe

Residential

Canada
Water

Rotherhithe

Project Data

Contract Duration: 18 Months
Services Value: £3.5 Million

J S Wright’s Residential Division have completed the A3 & A4 apartment blocks to the Canada Water development at Surrey Quays Road, London.

This phase consists of a total of 283 apartments, 144 within Ontario Point, a 25 storey apartment block and the remaining 139 within four low rise apartment blocks; Sherbrooke House, Brampton House, Winnipeg House and Victoria House.

J S Wright’s scope of work included:
  • Heating distribution installations, including the district heating plate heat exchanger plantroom
  • Underfloor heating installations to Ontaio Point
  • MVHR/MEV ventilation installations
  • Domestic Hot & Cold water services
  • Foul & Rainwater drainage systems
  • Sanitaryware installations to all apartments
  • Wet & Dry Riser installations
  • Basement refuse ventilatio

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

South West Lands Wembley Park, London

South West Lands Wembley Park, London

Residential

South West Lands

Wembley Park, London

Project Data

Client: The Hill Group and Network Homes

Architect: Howarth Tompkins

Contract Duration: 16 months

Contract Value: £3,500,000

South West Lands is a new housing development to the southwest of Wembley Stadium and part of developer Quintain’s 85-acre regeneration of Wembley Park.

J S Wright designed and installed the mechanical services for its 156 shared ownership and affordable rent apartments, spread over three buildings of 6, 10 and 19 storeys above ground-floor commercial space.

The two larger linked buildings are served by Quintain’s wider district heat network while the smallest building of 29 apartments has its own energy centre.

Mechanical Installations:
  • Low Pressure Hot Water (LPHW) heating system connected to district heat network in basement heating plantroom
  • LPHW heating system connected to three gas-fired condensing boilers in own plantroom serving smallest building
  • Distribution pipework to feed LPHW to apartment Heat Interface Units (HIUs) for hot water and underfloor heating
  • Boosted Cold Water (BCW) system including pipework from cold water plant room to serve all apartments
  • HIUs supplied on utility boards from in-house prefabrication department
  • Mechanical Ventilation Heat Recovery (MVHR) systems
  • Internal rainwater systems
  • Supply and installation of all sanitary ware
  • Individual apartment energy monitoring and prepayment billing systems
  • Above ground drainage systems
  • Building management controls

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Watermill Lane, Enfield

Watermill Lane, Enfield

Residential

Watermill
Lane

Enfield

Project Data

Contract Duration: 18 Months
Services Value: £3.27 Million

J S Wright’s Residential Division were responsible for this development located in Enfield within walking distance of the North Middlesex hospital.

It consists of 221 shared ownership & affordable residential units part funded by the Hospital Trust with Origin Housing Association.

J S Wright’s scope of work included:
  • Above ground foul and rainwater drainage
  • Cold water storage tank & booster set
  • Carbon steel & heavy grade pre-fabricated chilled water pipework distribution
  • District below ground boosted cold water & heating pipework distribution
  • Four gas fired boilers & CHP
  • Gas installation
  • MBUS eat metering, data collection & remote billing system
  • Heat Interface Unit installations within each of the 221 domestic dwellings
  • Whole house heat recovery supply & extract domestic ventilation
  • Supply & installation of all domestic sanitaryware
    Seven separate dry rising fire fighting mains
  • Eight naturally driven standalone life safety smoke ventilation systems
  • Two fan assisted standalone life safety smoke ventilation systems

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Marconi House, The Strand London

Marconi House, The Strand London

Residential

Marconi House
The Strand 

London

Project Data

Contract Duration: 12 Months
Services Value: £2.8 Million

Designed by Norman Shaw, Marconi House lies within the Strand Conservation Area. The development comprising of 86 superb luxury apartments and penthouses is set behind an imposing and grandiose Grade ll listed façade.

J S Wright were responsible for the design, installation and commissioning of the mechanical and public health services, including the building services control package for this most prestigious development. The apartments are finished to the highest possible standard and feature individually designed kitchen and bathrooms.

J S Wright’s scope of work included:
  • 86 Apartments comprising Studio, 1 Bed, 2 Bed and Duplex Units

  • All apartments Air Conditioned to suit individual needs

  • Building Management Control for each apartment

  • Chilled / LTHW Water Systems

  • Domestic Water Systems serving Kitchens and Bathrooms

  • Foul Drainage Systems

  • Sanitaryware Installation

  • Cincierge Reception Area with BMS Control to oversee the operation of

  • Apartment & Capital Plantv

  • Apartment Fire Control Sprinklers

  • Fresh Air Ventilation serving all apartments, along with reception area

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

The Rose Garden, Hereford

The Rose Garden, Hereford

Care Homes

The Rose
Garden

Hereford

Project Data

Client: The ExtraCare Charitable Trust
Contract Duration:  18 months
Services Value: £2,600,000

J S Wright’s Care Home Division were responsible for the design, installation and commissioning of the mechanical and public health services including the building services control package for this prestigious residential care home in Hereford.

The facility included 93 apartments each complete with high specification kitchens and bathrooms.

In addition, communal areas complete with restaurant dining area, hairdressing salon, fitness suite, jacuzzi, laundry and shop make up the overall experience of being a resident in this community living local.

J S Wright’s scope of work included:
  • Chilled water installation with remote external chiller

  • Heating installation from central boiler plant

  • Domestic hot and cold-water distribution

  • Mechanical ventilation to all areas including apartments and communal areas

  • Gas installation to boiler house and kitchen areas

  • Above ground drainage

  •  Sanitary ware to all apartments and communal areas

  • Full building services electronic control system

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Drayton Manor Hotel, Staffordshire

Drayton Manor Hotel, Staffordshire

Hotel

Drayton Manor
Hotel

Staffordshire

Project Data

Contract Duration: 20 Months
Services Value: £2.6 million

J S Wright have been involved in the construction of the new 150 bedroom hotel on the Drayton Manor Theme Park Development

The hotel consists of two 3 storey wings either side of a central glazed atrium and entrance area, and is complete with kitchen, dining areas, brasserie and various function and meeting rooms. The hotel being fitted out the highest of standards.

J S Wright’s scope of work included:Boosted cold water supply
  • Hot water supply

  • Above ground drainage

  • Heating distribution

  • Supply and extract ventilation

  • Full refrigerant air conditioning system

  • Refrigerant leak detection

  • All controls with BMS monitoring facility

  • Natural gas distribution

  • Localised comfort cooling

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Bagot Street, Birmingham

Bagot Street, Birmingham

Student Accommodation 

Bagot
Street

Birmingham

Project Data

Client: Iliad and Cosmopolitan Housing Association
Architect: Formroom Architects
Contract Duration: 15 months
Services Value: £1,640,000

The Bagot Street development consists of 119 multiple bedroom student flats for 656 students in two blocks. The flats have been designed with 4-6 of the en-suite rooms clustered around a spacious kitchen and lounge area.

The blocks are up to 17 storeys, with the ground floor comprising the accommodation administration centre.

J S Wright’s scope of work included:
  • Boosted cold water supply
  • Boosted hot water supply
  • Tank cold water
  • Above ground drainage
  • Dry riser installation
  • MTHW distribution to heat exchangers
  • Whole house ventilation
  • Localised mechanical ventilation
  • Localised comfort cooling
  • Hub room and server room air conditioning
  • Internal rainwater systems
  • BMS controls
  • Thermal insulation

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Goldfield House, West Bromwich

Goldfield House, West Bromwich

Care Homes

Goldfield
House

West Bromwich

Project Data

Contract Duration: 12 Months
Services Value: £1.4 Million

J S Wright were responsible for the design, installation and commissioning of the mechanical and public health services including the building services control package for this prestigious residential care home in West Bromwich.

The facility includes 93 apartments each complete with high specification kitchens and bathrooms. In addition, communal areas complete with restaurant dining area, hairdressing salon, fitness suite, jacuzzi, laundry and shop make up the overall experience of being a resident living in a local community.

J S Wright’s scope of work included:
  • VRF Heating & Cooling Installations
  • Heating Installation from Central Boiler Plant
  • Domestic Hot & Cold Water Distribution
  • Gas Installation to Boiler House & Kitchen Areas
  • Mechanical Ventilation to all areas, Including Apartments & Communal Areas
  • Above Ground Drainage
  • Sanitaryware to all Apartments & Communal Areas
  • Full Building Services Electronic Control System

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Beatties, Solihul

Beatties, Solihul

Commercial

Beatties
Department Store 

Solihul 

Project Data

Client: James Beattie PLC
Services Consultant: DW Pointer
Contract Duration: 14 months
Services Value: £1.4 million

James Beattie pie embarked upon a programme of major works to upgrade and extend their department stores within the UK.

J S Wright’s Commercial Division have carried out the installation of mechanical services to the extensions at Wolverhampton and Solihull.

J S Wright’s scope of work included:

 Gas-fired heating

 Chilled water installation

 Mechanical ventilation

 Domestic hot and cold-water services

 Gas installation

 Sprinkler system

 Services to kitchens and cafe

 Automatic controls and building management system

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Severn Trent, Shrewsbury

Severn Trent, Shrewsbury

Commercial

Severn Trent 
Call Centre

Shrewsbury

Project Data

Contract Duration: 10 Months
Services Value: £1.3 Million

J S Wright’s scope of work included:
  • Close Control Air Conditioning of the IT Server Room
  • LTHW Heating
  • Hot & Cold Water Systems
  • Foul and Waste Systems
  • Automatic BMS Controls
  • Natural Gas Installation
  • Ventilation of Kitchen, Communal Lounge, Cafeteria, Cleaners Cupboards
  • Sanitary and Brassware Supply & Install

The surrounding gardens feature many ‘green’ aspects such as rainwater reclamation, greywater system, reed beds, allotments for the staff and below ground fresh air intake duct system. The office also includes several ‘green engineering’ features to limit the use of energy. These are;

  • Natural Ventilation, Manual & Automatic
  • Below Ground Fresh Air Intake Duct System
  • Grey Water System for use in Staff WC’s
  • Solenoid Valves in the Hot and Cold Water Systems
  • Warm Air Recuperation Air Handling Units

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000