Mint Hotel, London

Mint Hotel, London

Hotel

Mint Hotel

London

Project Data

Contract Duration: 15 Months
Services Value: £10 Million 

J S Wright’s Hotel Division have completed the latest addition to the Mint Hotel Group, (formerly City Inns), at Tower Hill, Pepys Street, London.

The Hotel consists of 574 rooms spread over 9 floors. In addition to this, there are 5 meeting rooms, 3 conference rooms all with their own dining facilities, a main restaurant and bar-restaurant. An impressive sky lounge with its own meeting rooms, bar and dining facility and the dedicated kitchen is situated at roof level.

J S Wright’s scope of work included:
  • Chilled water and heating installation including off site boiler fabrication
  • Mechanical ventilation to all areas including bedroom, reception and back of house areas
  • Extra Low Temperature to fan coil units in bedrooms
  • Domestic hot and cold water distribution to all areas
  • Gas installations to main plant, CHP and kitchen areas
  • Kitchen services installations
  • A fully addressable Building Management System
  • Foul Drainage Systems
  • Sanitary ware to non residential areas
  • Life safety systems including smoke ventilation, associated fire rated duct work installations, smoke clearance and AOV installations.

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Drayton Manor Hotel, Staffordshire

Drayton Manor Hotel, Staffordshire

Hotel

Drayton Manor
Hotel

Staffordshire

Project Data

Contract Duration: 20 Months
Services Value: £2.6 million

J S Wright have been involved in the construction of the new 150 bedroom hotel on the Drayton Manor Theme Park Development

The hotel consists of two 3 storey wings either side of a central glazed atrium and entrance area, and is complete with kitchen, dining areas, brasserie and various function and meeting rooms. The hotel being fitted out the highest of standards.

J S Wright’s scope of work included:Boosted cold water supply
  • Hot water supply

  • Above ground drainage

  • Heating distribution

  • Supply and extract ventilation

  • Full refrigerant air conditioning system

  • Refrigerant leak detection

  • All controls with BMS monitoring facility

  • Natural gas distribution

  • Localised comfort cooling

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Premier Inn Greenwich

Premier Inn Greenwich

Hotel

Premier Inn
Greenwich

London

Project Data

Contract Duration: 10 Months
Services Value: 1 Million

J S Wright’s Hotel Division were responsible for the supply and installation of air conditioning (VRF) to serve 150 bedrooms along with restaurant, reception and offices within the complex, this also included hot and cold water services, mechanical ventilation and waste systems.

J S Wright’s scope of work included:
  • Air Conditioning system to serve 150 bedrooms along with reception and management offices
  • Ventilation systems to bedrooms, reception, public toilets and kitchen area
  • Hot and Cold Water Systems to all bedrooms and public areas
  • BMS trend control for hot water services along with air conditioning system within management office

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Etap Hotel, Leeds

Etap Hotel, Leeds

Hotel

Etap
Hotel

Leeds

Project Data

Contract Duration: 9 Months
Services Value: £630,000

J S Wright’s Hotel Division have completed the installation of the Mechanical and Plumbing Services to the new 218 Bedroom 2/3 Star Etap Hotels at Leeds.

J S Wright’s scope of work included:
  • The complete installation on this project was carried out utilising Crimped Tube and Fittings.
  • Bedroom Comfort Cooling System via External Heat
  • Pump and Fan Coil Units
  • Ventilation
  • Hot and Cold Water Systems
  • Foul and Rainwater Disposal
  • Gas Installation
  • Sanitary Ware Installation
  • Automatic Control
  • Dry Riser

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000

Bloc Hotel, Jewellery Quarter, Birmingham

Bloc Hotel, Jewellery Quarter, Birmingham

Hotel

Bloc Hotel
Jewellery Quarter

Birmingham

Project Data

Client: Boxbuil
Architect: J. Ross
Contract Duration: 6 months
Services Value: £330,000

J S Wright’s Hotel Division have completed the installation of the mechanical and plumbing services to this new 67-bedroom hotel located in the Jewellery Quarter, Birmingham’s vibrant cultural heart. Offering ultra-modern decor, the Bloc hotel’s rooms are inspired by Japanese space-saving interior design.

The rooms are air-conditioned and feature Italian-tiled shower rooms with a luxury drench shower.

Heating and cooling to the bedrooms is provided by ducted type VRF indoor units mounted directly above the door of the room. Each unit is supplied complete with simplified wall mounted room controller.

The installation is a two-pipe system allowing all rooms units to provide heating or cooling at any one time. External condensers are mounted on the flat roof.

J S Wright’s scope of work included:
  • air conditioning and heating

  • ventilation

  • hot and cold-water systems

  • foul and waste system

  • automatic controls

jswright@jswright.co.uk
Established: 1890
Private Limited Company
Vat No. 463 2448 48

Atlas Building
16 Portland Street
Birmingham B6 5RX
0121 322 4000