J S WRIGHT SECURES FINAL PHASE OF FISH ISLAND VILLAGE

A CGI of what Phase 3 of Neptune Wharf at Fish Island Village will look like

J S Wright has secured a contract worth more than £3 million for the third and final phase of a ground-breaking estate regeneration in London’s Docklands.  J S Wright has secured a contract worth more than £3 million for the third and

The company will supply and install all the mechanical services for 165 one to three-bedroom private and affordable apartments at Neptune Wharf in Fish Island Village, Hackney Wick.

The Phase 3 apartments will be spread across five buildings with wharf-inspired designs inspired by the warehouse typology of the area’s industrial past. The buildings will include co-worker space run by social enterprise The Trampery.

J S Wright was awarded the contract by developer Hill, in association with housing association Peabody, following its completion of the 423 private and affordable homes in the first two phases of the canalside development.

The work will involve installing a low-temperature hot water heating system to deliver energy to the apartments from an energy centre already built by J S Wright in the basement car park for Phases 1 and 2 of the development.

Low temperature hot water will be delivered through associated pipework to heat interface units that in turn will feed underfloor heating within each apartment. A boosted cold-water system will also be fitted for the domestic hot and cold-water supply.

J S Wright will also install energy efficient mechanical ventilation heat recovery systems that will use the outgoing air from the apartments to heat incoming fresh air, as well as equip all the units and communal areas with dry risers and domestic sprinklers for fire protection.

In addition, the company will fit the sanitary ware for each apartment, as well as an internal rainwater system and all above-ground drainage. It will also install building management controls including metering for each unit’s energy use.

J S Wright is due to start work on site in March with completion scheduled for May 2021.

The company has equipped more than 1,500 new homes across London for Hill over the past three years and recently completed Phase 1B of its 1,500-home Blackwall Reach development in Tower Hamlets.

Phil Leech, Managing Director of J S Wright, said: “We are thrilled that our excellent work on the first two phases of Neptune Wharf has resulted in fitting out the full complement of energy efficient homes in a development that should sustain a vibrant canalside community and reflect a rich industrial heritage.”