   |
Aston University
Birmingham |
|
Project Data
Client: Aston University
Main Contractor: Carillion plc
Architect: Lewis & Hickey
Contract Duration: 18 Months
Services Value: £4,700,000
J S Wright's have been involved since Febuary 2009 in the development of the new 1300 bedroom student accommodation block on the Aston University campus completed in Augest 2010. The development consists of 4 linked buildings ranging in height from 8 to 17 storeys, arranged around and overlooking a raised sports pitch.
J S Wright's scope of work included:
- Boosted Cold Water Supply
- Hot Water Supply
- Above Ground Drainage
- Dry Riser Installation
- Heating distribution
- Whole House Ventilation
- Localised mechanical ventilation
- Rainwater Harvesting System
- Localised comfort cooling
- Hub room & Server room air conditioning
- External Irrigation System.
- All controls with remote BMS monitoring facilities
|


|
|