   |
Unite
Birmingham |
|
Project Data
Client: Unite
Main Contractor: Carillion Building
Architect: Hadfield Cawkwell Davidson (Sheffield)
Contract Duration: 24 Months
Services Value: £1,450,000
J S Wright's Student Accommodation Division has been involved with the development of 925
bedrooms, over two phases, overlooking the outskirts of Birmingham City Centre Area.
Part of the first phase also included the refurbishment of an existing BT exchange building.
J S Wright's scope of work included:
- Boosted Cold Water Supply
- Leak Detection System
- Mechanical Ventilation / Heat Recovery
- Unvented Hot Water
- Above Ground Drainage
- Dry Riser Installation
- Comfort Cooling
- Co-ordinated Autocad Design
|


|
|