   |
Woodside Leisure
Centre Watford |
|
Project Data
Client: Watford Borough Council
Main Contractor: Pellikaan Construction
Architect: Hadfield Cawkwell Davidson (Sheffield)
Contract Duration: 11 Months
Services Value: £1,400,000
J S Wright's Leisure Division were involved in the Design and Installation of the Mechanical & Public Health Services to this prestigious Leisure Centre in Watford.
J S Wright's scope of work included:
-
Mechanical Ventilation including Heat Recovery via Thermal Wheels
-
Installation of Ground Source Source Heat Pump linked to Borehole System
-
Installation of 60m Solar Thermal Panel System
-
Gas Fired LPHW Heating Installation
-
Water cooled VRF System utilising Renewable Energy Technology
-
Waste Water Heat Recovery System
-
Rainwater Recycling System
-
Domestic Hot & Cold Water Services
-
Gas Installation
-
Automatic Controls & Building Management Systems
-
Sanitary Pool Heating |


|
|