   |
Park Plaza Hotel
London |
|
Project Data
Client: Park Plaza
Main Contractor: Galliard Construction
Contract Duration: 20 Months
Services Value: £4,500,000
J S Wright's Hotel Division were responsible for the design installation and commissioning of the mechanical and Public Health Services to this prestigious hotel situated within Central London adjacent to London Waterloo Station. The hotel consists of 398 bedrooms; restaurants; conference rooms; bars; gymnasium; saunas; kitchens and back of house areas / plant rooms.
J S Wright's scope of work included:
-
Chilled water and heating installation including off site modular boiler fabrication
-
Mechanical ventilation to all areas including bedroom,reception and back of house areas
-
Fully addressable fan coil units
-
Domestic hot and cold water distribution to all areas
-
Gas installations to main plant, CHP and kitchen areas
-
Kitchen services installations
-
A fully addressable Building management system with front end
-
Foul Drainage Systems
-
Sanitaryware to non residential areas
-
Life safety systems including smoke ventilation, associated fire rated duct work installations, smoke curtains and AOV installations. |
 
|
|