|
   |
Mint Hotel
London |
|
Project Data
Client: Mint Hotel Group
Main Contractor: Laing O’Rourke
Contract Duration: 15 Months
Services Value: £10,000,000
J S Wright's Hotel Division have completed the latest addition to the Mint Hotel Group, (formerly City Inns), at Tower Hill, Pepys Street, London. The Hotel consists of 574 rooms spread over 9 floors. In addition to this, there are 5 meeting rooms, 3 conference rooms all with their own dining facilities, a main restaurant and bar restaurant. An impressive sky lounge with its own meeting rooms, bar and dining facility and dedicated kitchen is situated at roof level.
J S Wright's scope of work included:
- Chilled water and heating installation including off site boiler fabrication
- Mechanical ventilation to all areas including bedroom, reception and back of house areas
- Extra Low Temperature to fan coil units in bedrooms
- Domestic hot and cold water distribution to all areas
- Gas installations to main plant, CHP and kitchen areas
- Kitchen services installations
- A fully addressable Building Management System
- Foul Drainage Systems
- Sanitary ware to non residential areas
- Life safety systems including smoke ventilation, associated fire rated duct work installations, smoke clearance and AOV installations.
|
 
|
|