Home Hotel Mint Hotel
Mint Hotel

 

Mint Hotel 

 

London

 

Project Data

 

Client: Mint Hotel Group

Main Contractor: Laing O’Rourke

Contract Duration: 15 Months

Services Value: £10,000,000

 

J S Wright's Hotel Division have completed the latest addition to the Mint Hotel Group, (formerly City Inns), at Tower Hill, Pepys Street, London. The Hotel consists of 574 rooms spread over 9 floors. In addition to this, there are 5 meeting rooms, 3 conference rooms all with their own dining facilities, a main restaurant and bar restaurant. An impressive sky lounge with its own meeting rooms, bar and dining facility and dedicated kitchen is situated at roof level.

 

J S Wright's scope of work included:

  • Chilled water and heating installation including off site boiler fabrication
  • Mechanical ventilation to all areas including bedroom, reception and back of house areas
  • Extra Low Temperature to fan coil units in bedrooms
  • Domestic hot and cold water distribution to all areas
  • Gas installations to main plant, CHP and kitchen areas
  • Kitchen services installations
  • A fully addressable Building Management System
  • Foul Drainage Systems
  • Sanitary ware to non residential areas
  • Life safety systems including smoke ventilation, associated fire rated duct work installations, smoke clearance and AOV installations.